中文

FPSO

Floating Production, Storage and Offloading

Scroll
Loading the film 0%

How it comes together

From first module to first oil.

  1. 01

    Topside modules

    Process, compression, utility and power modules, engineered to one standard.

  2. 02

    Integration

    Pre-engineered interfaces bring hull and topsides together under one roof.

  3. 03

    Yard to sea

    Lifted, completed and commissioned in our own yards on the Yangtze estuary.

  4. 04

    Ready to operate

    Towed out and handed over as a working asset, ready for first oil.

Standard design

One hull. Proven numbers.

Principal dimensions

Length overall
308.00m
Length between perpendiculars
294.00m
Breadth molded
57.00m
Depth molded
29.80m
Persons on board
120persons

Processing capacity

Oil processing
80,000BOPD
Total liquids (oil + produced water)
180,000BOPD
Gas lift
20MMSCFD
Total gas processing (incl. gas lift)
160MMSCFD
Water injection
160,000BWPD
Produced water
100,000BWPD

Why a standard FPSO

Decided once. Delivered faster.

  1. 01

    Fast, accurate bidding

    Firm pricing early, from a known design.

  2. 02

    Lessons built in

    Every project improves the standard.

  3. 03

    Pre-engineered interfaces

    Hull and topsides designed to meet.

  4. 04

    Design under one roof

    Topside and hull, one engineering team.

  5. 05

    Shorter FEED

    Less time before execution starts.

  6. 06

    Integrated EPCIC

    One accountable team from design to start-up.

Lower emissions

Low-carbon by design.

  • Energy efficiency
  • Closed flare
  • Combined cycle
  • All-electric topside
  • Carbon capture & re-injection
  • Submerged turbine generator
  • Digitalization with AI
  • Low-emission architecture

See the full specification.