
Loading the film 0%
How it comes together
From first module to first oil.
- 01
Topside modules
Process, compression, utility and power modules, engineered to one standard.
- 02
Integration
Pre-engineered interfaces bring hull and topsides together under one roof.
- 03
Yard to sea
Lifted, completed and commissioned in our own yards on the Yangtze estuary.
- 04
Ready to operate
Towed out and handed over as a working asset, ready for first oil.
Standard design
One hull. Proven numbers.
Principal dimensions
- Length overall
- 308.00m
- Length between perpendiculars
- 294.00m
- Breadth molded
- 57.00m
- Depth molded
- 29.80m
- Persons on board
- 120persons
Processing capacity
- Oil processing
- 80,000BOPD
- Total liquids (oil + produced water)
- 180,000BOPD
- Gas lift
- 20MMSCFD
- Total gas processing (incl. gas lift)
- 160MMSCFD
- Water injection
- 160,000BWPD
- Produced water
- 100,000BWPD
Why a standard FPSO
Decided once. Delivered faster.
- 01
Fast, accurate bidding
Firm pricing early, from a known design.
- 02
Lessons built in
Every project improves the standard.
- 03
Pre-engineered interfaces
Hull and topsides designed to meet.
- 04
Design under one roof
Topside and hull, one engineering team.
- 05
Shorter FEED
Less time before execution starts.
- 06
Integrated EPCIC
One accountable team from design to start-up.
Lower emissions
Low-carbon by design.
- Energy efficiency
- Closed flare
- Combined cycle
- All-electric topside
- Carbon capture & re-injection
- Submerged turbine generator
- Digitalization with AI
- Low-emission architecture
