How it works
Gas in. LNG out. On one hull.
- 01
Gas reception
Feed gas arrives by subsea pipeline; inlet treatment removes condensate and water.
- 02
Pre-treatment
Acid gas, water and mercury are removed to protect the cryogenic plant.
- 03
Liquefaction
A mixed-refrigerant cycle cools the gas to −162 °C, in modular trains.
- 04
Storage & offloading
Stored on board and offloaded side-by-side to LNG carriers.
Standard design
Scale by trains, not by re-engineering.
Capacity range
- Smallest train
- 0.6MTPA
- Portfolio maximum
- 6.0+MTPA
- Liquefaction
- −162°C
- SPB® tank construction capacity
- 45,000m³
Nguya FLNG
- Annual capacity
- 2.4MTPA
- Length overall
- 376m
- First LNG cargo
- 2026Feb
- Location
- Republic of the Congo
Product portfolio
SMR
Single mixed refrigerant
Fewer equipment items and a compact, light footprint, for fast-track and space-constrained projects. Proven in floating service.
- 0.6MTPAFEED + EPC
- 1.2MTPAFEED + EPC
- 1.5MTPAFEED
- 2.0MTPAFEED
DMR
Dual mixed refrigerant
Two independent refrigerant cycles, staged high and low, for energy-efficient liquefaction at larger scale.
- 2.5MTPABaseline
- 3.0MTPAScalable
- 4.0MTPAScalable
- 5.0MTPAScalable
- 6.0+MTPAProject-specific
Final configuration is set in FEED, from the gas resource, site conditions and project economics.
Why Wison FLNG
Proven offshore. Standard by design.
- 01
EPCIC turnkey
Engineering to commissioning, one team — faster first LNG.
- 02
World-first barge FLNG
Tango FLNG was the first barge-type FLNG in commercial production.
- 03
Proven offshore
Nguya FLNG delivered its first LNG cargo off the Republic of the Congo in February 2026.
- 04
Standardized & scalable
Standard hulls from 0.6 to 6.0+ MTPA.
- 05
Add trains to grow
Capacity grows by adding trains, not redesigning.
- 06
Redeployable
One floating asset instead of an onshore plant.
Technology
Multiple train sizes. One standardized platform.
- SMR liquefaction
- DMR liquefaction
- IPSMR liquefaction
- Shell e-DMR
- Smart FLNG
- Low-carbon solutions
- Combined-cycle power
- SPB containment
- Standardized hull
- Modular topside trains
- Side-by-side offloading
- Ship-to-ship transfer