One team, from design to operation.

EPCIC plus O&M, delivered by one contractor, and the projects that prove it.

EPCIC + O&M

Six stages. No hand-offs.

Engineering, procurement, construction, installation, commissioning and operation, under one contract.

01

Engineering

Concept, FEED and detailed design, by 1,000 in-house engineers.

02

Procurement

Global supply chain, qualified suppliers and long-lead items secured early.

03

Construction

Hulls, SPB tanks, modules and integration, in our own yards.

04

Installation

Transport, marine operations and offshore execution.

05

Commissioning

Yard gas trial, start-up and handover into operation.

06

O&M

Operations and maintenance across the asset's life.

Integrated EPCIC + O&M

One contractor. Turnkey.

The team that wins the bid is on the quay at first cargo.

Less schedule risk

One party, one schedule: no handover gaps.

Less accountability gap

One contract, one team, with O&M designed in from day one.

Less cost overrun

Fixed-price EPCIC + O&M, locked at design freeze. Budget certainty, traceable change.

6

Delivery stages

1,000

In-house engineers

2

Fabrication yards

23

Countries delivering

Delivery model

Designed in Shanghai. Built on the Yangtze.

Shanghai head office

Engineering, procurement & project management

  • FEED and pre-FEED to project specification
  • Standardized design shortens the schedule
  • Detailed design up to issued for construction
  • Long-lead items through global supply partnerships
Nantong yard

Small to mid-size floating products and SPB tanks

  • Dry dock and 2,000 t gantry crane
  • SPB tanks and hull built in parallel, for a shorter schedule
Qidong yard

Large floating products, integration and commissioning

  • Ultra-large dock, 2,400 t gantry crane, 80,000-ton coastline
  • 40 smart production lines planned
  • Yard gas trial before sail-away
  • Commissioning, start-up and handover to operations

Project showcases

Built, sailed away, in operation.

Delivered

FLNG · EPCIC · 2.4 MTPA

Nguya FLNG

For Eni, off Pointe-Noire, Republic of the Congo. First LNG cargo in February 2026.

View the project
FLNG · EPC · 0.6 MTPA

Tango FLNG

For Exmar. Gas trial in September 2016, delivered January 2017; in service for Eni in the Republic of the Congo since December 2023.

FSRU · EPC · 600 MMSCFD

S188 FSRU

For Exmar. The world's first new-build FSRU barge, delivered December 2017.

In execution

FLNG · EPCIC · 1.2 MTPA

Genting FLNG

For Genting. Hull launched December 2025; module lifting June 2026.

FPSO · EPCIC · 90,000 BOPD

Baleine Phase 3 FPSO

For Eni and Altera Infrastructure. EPCIC contract awarded May 2026.

FPU · EPCIC · 25 million SCMD

Sakarya Phase 3 FPU

For Türkiye Petrolleri (TPAO). Topsides fabrication under way since May 2026.

Planning a floating energy project?