One team, from design to operation.
EPCIC plus O&M, delivered by one contractor, and the projects that prove it.
EPCIC + O&M
Six stages. No hand-offs.
Engineering, procurement, construction, installation, commissioning and operation, under one contract.
Engineering
Concept, FEED and detailed design, by 1,000 in-house engineers.
Procurement
Global supply chain, qualified suppliers and long-lead items secured early.
Construction
Hulls, SPB tanks, modules and integration, in our own yards.
Installation
Transport, marine operations and offshore execution.
Commissioning
Yard gas trial, start-up and handover into operation.
O&M
Operations and maintenance across the asset's life.
Integrated EPCIC + O&M
One contractor. Turnkey.
The team that wins the bid is on the quay at first cargo.
Less schedule risk
One party, one schedule: no handover gaps.
Less accountability gap
One contract, one team, with O&M designed in from day one.
Less cost overrun
Fixed-price EPCIC + O&M, locked at design freeze. Budget certainty, traceable change.
6
Delivery stages
1,000
In-house engineers
2
Fabrication yards
23
Countries delivering
Delivery model
Designed in Shanghai. Built on the Yangtze.

Engineering, procurement & project management
- FEED and pre-FEED to project specification
- Standardized design shortens the schedule
- Detailed design up to issued for construction
- Long-lead items through global supply partnerships

Small to mid-size floating products and SPB tanks
- Dry dock and 2,000 t gantry crane
- SPB tanks and hull built in parallel, for a shorter schedule

Large floating products, integration and commissioning
- Ultra-large dock, 2,400 t gantry crane, 80,000-ton coastline
- 40 smart production lines planned
- Yard gas trial before sail-away
- Commissioning, start-up and handover to operations
Project showcases
Built, sailed away, in operation.
Delivered

Nguya FLNG
For Eni, off Pointe-Noire, Republic of the Congo. First LNG cargo in February 2026.
View the project
Tango FLNG
For Exmar. Gas trial in September 2016, delivered January 2017; in service for Eni in the Republic of the Congo since December 2023.

S188 FSRU
For Exmar. The world's first new-build FSRU barge, delivered December 2017.
In execution
Genting FLNG
For Genting. Hull launched December 2025; module lifting June 2026.
Baleine Phase 3 FPSO
For Eni and Altera Infrastructure. EPCIC contract awarded May 2026.
Sakarya Phase 3 FPU
For Türkiye Petrolleri (TPAO). Topsides fabrication under way since May 2026.
Across the portfolio
The same team, on every platform.

234 MW floating gas power plant
Floating power, delivered for fast, reliable supply.
Floating power
China's first floating wind project
A 5.5 MW demonstration unit, off Guangdong.
Floating wind
Multi-train onshore LNG, Africa
Multiple 1.2 MTPA trains built as modules, 2022.12 – 2026.07.
Modular LNG